From: route@monster.com
Sent: Thursday, April 07, 2016 11:55 AM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 Scheduler
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
STACI LIPPONResume,
Page 1 Staci Lippon 721 E Lyons St t Sulphur, LA 70663 337-563-1567 t swlippon5535@yahoo.com Senior Scheduler Experienced Scheduler and project administrator with general
understanding of building engineering, production and construction timelines
and practices. Sound expertise developing and managing processes that require
innovation, ingenuity and proactivity and highly successful planning and
scheduling workflow for each operation according to established sequences and
lead times. CORE
COMPETENCIES
EXPERIENCES
AND ACHIEVEMENTS NOBLE
DRILLING, Houston, TX2015 – Current Sr. P6
Scheduler & Project Administration Essential collaborator responsible for ensuring smooth and efficient
running of operations through overall management of master plan/schedule and
overall administration for all projects including oversight of construction
progress, performance and compliance with contractual agreements. Plan,
organize, and control a range of cross-functional activities and projects,
ensuring the development of effective systems and processes. t Develop program IMS, incorporating EVM techniques, weightings, and
risk mitigation activities to establish the schedule baseline and subsequent
planning, prioritizing, and monitoring programs workload. t Liaise with Program Management to develop Statement of Work, Statement
of Repair, Work Breakdown Structure and cost control reporting. t Manage SAP aspects of the on-site material management processes. t Provided administrative and project support in all core areas
including interfacing with operations, owners, suppliers and subcontractors
to discuss impact of work and resolution of problems. LEEVAC SHIP
BUILDING, Jennings, LA2013– 2014 Production
Control Manager/ Planning & Scheduling, New Construction Played a pivotal role in scheduling and production control of
different type of vessels with 6 vessels in various stages of construction
concurrently. Developed and tracked schedule performance metrics and prepared
High Level Metrics with forecasted and actual data for monitoring cost and
manpower needs. Maintained development, documentation, execution, audit, and
improvement of the program’s scheduling process. t Contributed to new business development by creating bid proposal
schedules based on build strategy information. t Detected early warning signs of impending problems though ongoing
analysis of schedule performance utilizing relevant metrics such as EVM,
start/finish, milestone movement, and critical path monitoring. SIGNAL
INTERNATIONAL SHIP BUILDING, Orange, TX2012 – 2013 Sr. P6 Scheduler / Production Control, New Construction and Repair Work Managed bid proposal and project scheduling, progressing schedules on
a daily basis and analyzing performance. Identified, followed up and linked
activities in accordance with established build strategies and project
milestones. Interfaced with program IPTs, operating departments, and all
levels of management to ensure efficient flow of information and proactive
problem resolution. t Developed detailed program schedules from inception to delivery. t Gathered data and created measures for senior management to gage
program health. BAY SHIP
BUILDING, Sturgeon Bay, WI2012 Sr. P6 Scheduler / Production Control, New Construction and Repair Work Planned, prepared, issued, and controlled production schedules and
coordinates with material requirements to ensure a controlled flow of
approved materials timed to meet production requirements. Advised management
of the status of work in progress, material availability, and potential
production problems to ensure that personnel, equipment, materials, and
services were provided as needed. t
Developed visibility/control centers and
maintained all centers for current status. t Assisted with creating corrective actions and recovery plans and
reported problem areas to management with mitigation suggestions. NORTHROP
GRUMMAN CORPORATION, New Orleans, LA1995 - 2011 Analyst, Planning & P6 Scheduling / Executive
Administrative Assistant, Aircraft Division Used statements of work, prepared master production plans and
schedules fully integrated and resource loaded. Detailed statement of work
and forecast resources with budget allocations and produced reports on
project status including schedule performance and cost performance index. t Oversaw 19 progress coordinators and provided leadership and guidance
for day-to-day activities. t Led Six Sigma Green Belt team in a specified project from start to
end. t Audited groups for compliance with ISO 9001 standards, issued CAR and
wrote polices, procedures and guidelines. t Managed day-to-day administrative activities for the sector director. EDUCATION Bachelor of Science/Business
Administration credits, Dallas Baptist University & University of
Maryland EVMS Training (Earned Value Management System) Primavera P6 Certificate ISO 9001 Auditor Certificate Six Sigma Green Belt Certified |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|